[Replace with photo of the installation]
Johar Town, Lahore
Solar Panel Washing
Professional washing restored output on a dusty 10 kW rooftop.
- Client
- Private residence
- Completed
- 2026
- System
- 10 kW
- Duration
- 3 hours
What we did
We studied 12 months of bills and the roof layout, then designed a 10 kW system sized to the real daytime load, with room to add more panels later. Our own team handled structure, wiring, commissioning and app setup.
- Site survey & load analysis
- Custom structure design
- Hybrid inverter + lithium storage
- App monitoring & after-sales
Results
90%
Efficiency after wash
3 hrs
On site
0
Scratches
“Our UPS kept failing. They repaired it, then moved us to solar with backup. Zero downtime since.”