Industrial area, Lahore
Factory Rooftop Solar
On-grid rooftop plant with net-metering to cut daytime production costs.
- Client
- Textile unit
- Completed
- 2026
- System
- 250 kW on-grid
- Duration
- 3 weeks
What we did
We studied 12 months of bills and the roof layout, then designed a 250 kW on-grid system sized to the real daytime load, with room to add more panels later. Our own team handled structure, wiring, commissioning and app setup.
- Site survey & load analysis
- Custom structure design
- Hybrid inverter + lithium storage
- App monitoring & after-sales
Results
62%
Lower monthly bill
250 kW
Installed
Net
Metering approved